SFP+ to SFP+-10G-AOC-70M230FT 10G SFP+ Industrial Active Optical Cable, 70m (230ft)

The SFP+ to SFP+-10G-AOC-70M230FT compatible cable combines 10G AOC connectivity with a defined 70m (230ft) pathway between SFP+ to SFP+ interfaces. It is intended for Generic equipment and is documented here as a distinct order code, allowing cable schedules, service access and related length selections to be reviewed before installation.
OEM Part Number: SFP+ to SFP+-10G-AOC-70M230FTHT Part Number: SFP+ to SFP+-10G-AOC-70M230FT
Product Highlights
- HT-manufactured AOC assembly in 70m (230ft)
- Interface configuration: SFP+ to SFP+
- Fixed length and part number: 70m (230ft), SFP+ to SFP+-10G-AOC-70M230FT
- Minimum bend radius: 30mm
Specifications
| HT Part Number | SFP+ to SFP+-10G-AOC-70M230FT |
|---|---|
| Manufacturer | HT |
| Connector Type | SFP+ to SFP+ |
| Max Supply Voltage | 3.45 V |
| Minimum Bend Radius | 30mm |
| Cable Length | 1~300m@OM3 MMF |
| Wavelength | 850nm |
| Built-in CDR | NO |
| Transmitter Type | VSCEL |
| Receiver Type | PIN |
| Modulation | NRZ |
| Bit Error Rate | 1E-12 |
| Jacket Material | OFNP |
| Built-in FEC | NO |
| Protocols | SFF-8431,10GBASE Ethernet, Fibre Channel |
| Operation temperature | -40 to 85°C (-40 to 185°F) |
Cable Construction and Routing
This assembly uses OFNP jacket, minimum bend radius 30mm. These mechanical characteristics affect how the cable should be dressed behind the equipment. Avoid sharp edges, excessive ties and repeated tight bends close to the connector boots.
Position Within the Length Range
SFP+ to SFP+-10G-AOC-70M230FT is the longest of 3 verified length options in this family. Compared with SFP+ to SFP+-10G-AOC-50M164FT at 50m (164ft), it provides 20m of additional reach for a longer vertical drop, a wider rack or an adjacent-cabinet route. Confirm that the complete path requires this length, because unused slack still needs supported, bend-safe storage.
Structured Pathways and Serviceability
Treat the direct-attach assembly as part of the permanent pathway plan even when the link is expected to be temporary. Follow the intended horizontal and vertical managers, maintain the specified bend radius and leave service access around both ports. A small, supported service allowance is preferable to excess slack concealed inside a rack or placed under cable-tie pressure. For this assembly, the minimum bend radius is 30mm; the jacket material is OFNP.
Network and Protocol Considerations
The intended application is determined by the host interface and protocol support. Listed interface and protocol references include SFF-8431,10GBASE Ethernet, Fibre Channel. Confirm that the host firmware and port configuration support the same operating mode.
Integrated Optical Assembly
The optical engines and fiber are permanently integrated into this AOC. There are no detachable optical modules to clean or exchange. Handle the complete assembly by its connector housings and cable, and keep both ends matched to the same interface specification.
Length Selection and Installation Planning
With 70m (230ft) available, the installer has more routing freedom but also more cable to control. Determine where any remaining service loop will be stored, preserve the stated bend radius and keep the loop away from sharp edges and hot exhaust. The integrated optical cable and both optical engines should remain accessible for inspection and removal. The next shorter verified assembly is SFP+ to SFP+-10G-AOC-50M164FT at 50m (164ft), which is the better comparison when the managed route leaves substantial unused cable.
Ordering Information
Include the part number, fixed length, quantity and required pathway or rack grouping in the order information. The host model and firmware release are useful for change-controlled deployments. Different lengths should remain separate order lines so delivered labels and packing records agree with the pathway plan. Quantity and any labeling instructions should be attached specifically to SFP+ to SFP+-10G-AOC-70M230FT.
Generic Compatibility and Factory Testing
Verification covers the physical connectors, expected host identity and an operating link with available diagnostic indications. We distinguish this complete check from a simple continuity test. Platform model and software release can be reviewed in advance where the installation has strict documentation or change-control requirements. Where supported by the host, receive activity and diagnostic indications are reviewed together with the established link.
Shipping and Lead Time
Standard configurations normally ship within one to three working days, while production quantities are confirmed with the order. International express, air cargo and sea freight can be selected according to destination and carton volume; customer courier accounts and nominated forwarders are also accepted.
Quality Assurance and Packaging
After connector inspection and link verification, the assembly is coiled without tight bends and packed with end protection. Labels can cross-reference the customer cable schedule, OEM part number and length. This supports both receiving checks and later moves, adds or changes. Neutral packaging and customer-specific packing documentation are available on request.
Frequently Asked Questions
Is this an original equipment manufacturer cable?
No. It is manufactured by HT under our own manufacturer identity.
Can excess cable be folded into a compact bundle?
No. Use a supported, bend-safe service loop and observe the listed minimum bend radius. Do not crease the cable or tighten ties around the connector boots.
Will any matching connector operate at the same speed?
Not necessarily. Both hosts must support the stated rate, identification, lane mapping and any required breakout configuration; mechanical compatibility alone is insufficient.
What details assist a compatibility review?
Provide the equipment manufacturer, model, port type, hardware revision and software release, together with the OEM reference, required length and quantity.